top of page
St. Johns Gymnasium
Washington, DC
GC: Donohoe Construction
Architect: Perkins Eastman
Square Feet: 15K
Daily Manpower Range: 20-25
LEED: Yes
Scope: Demolition
–––––––
Rock Spring’s demolition scope included the tear down and removal of the two story existing gymnasium structure along with slab on grade removal. Rock Spring brought in heavy equipment and implemented high level safety requirements to complete the project on an on active high school campus.

bottom of page