601 D St Repositioning
Washington, DC
GC: Davis Construction
Architect: Studios Architecture
Square Feet: 500K
Daily Manpower Range: 40-50
LEED: Yes
Scope: Demolition
–––––––
Rock Spring kicked off this full building repositioning which including the removal of 12 floors of office space, a façade opening, and approximately 5,000 SF of elevated slab removal. Rock Spring also furnished and installed all interior and exterior temporary barrier systems for the project.